The FRRI project included the repair of flood damage on rural roads, bridges, inflow and outflow ducts as well as at rural schools. The reason for the project was the high damage to rural infrastructure caused by the exceptionally high flooding of the rainy season in 2011. The FRRI was implemented in the provinces of Kampong Cham, Kampong Chhnang, Siem Reap, Kampong Thom, Kratie and Prey Veng. A total of 117 km of rural roads and seven schools were repaired. The project ran parallel to the long-standing activities of German FC as part of the Rural Infrastructure Programme (RIP), which has been rehabilitating rural roads and social infrastructure in various phases and regions from 2007 to date.
Share page
To share the content of this page with your network, click on one of the icons below.
Note on data protection: When you share content, your personal data is transferred to the selected network.
Data protection
Alternatively, you can also copy the short link: https://www.kfw-entwicklungsbank.de/s/enzBYG97
Copy link Link copied