Safeguarding energy transmission in the South Caucasus

    Description

    As part of the FC measure, a fundamental rehabilitation of the 220kV Gyumri 2 substation was carried out to eliminate a major weakness in the Armenian 220kV transmission network. The facility located in the north-west of the country was built in 1972, severely damaged by an earthquake in 1988, and restored only in a makeshift manner in 1992, which meant its safe and reliable operation was no longer guaranteed.

    Overall rating: 3

    Is based on:

    Relevance: 2
    Effectiveness: 3
    Efficiency: 3
    Impact: 3
    Sustainability: 2

    Evaluation criteria & rating scale

    ­

    Country:Armenia
    Sector:Energy
    Budget funds: 7.300.000 €
    Total funds:14.600.000 €
    Year of project completion:
    2016

    Notes on the methods

    Download PDF